TVS diode derating is not a single percentage applied to every number on the datasheet. Continuous operating voltage, pulse energy, junction temperature and board thermal path are four independent limits, and the device fails at the tightest one first.

Direct answer

List four boundaries first: the highest continuous voltage against VRWM, the actual pulse energy against the stated rating, a measurable temperature against leakage and life limits, and the pad and copper against junction temperature. Set the margin from the tightest boundary, then verify it on the target board under real operating conditions.

Continuous voltage and pulse energy are separate limits

Sustained bias is judged against VRWM and high-temperature leakage. Transient stress is judged against VC and IPP under a stated waveform. Scaling both by one ratio hides the limit that fails first.

Review itemCondition to recordWhy it matters
Continuous biasHighest working voltage, tolerance and hot stateLow VRWM margin raises leakage and temperature
Pulse stressWaveform, peak current, width and repetitionRatings hold only for the stated single event
Thermal pathAmbient, pad, copper and nearby heatJunction temperature drives leakage and life
Downstream nodeAbsolute rating of the protected nodeThe clamp window is limited from both sides

Junction temperature belongs in the record

Derating ends at temperature. Under the same pulse, pad area, copper coverage, layer stack and neighbouring parts change the real device temperature. Measure a repeatable temperature point on the target board instead of estimating from a catalogue thermal resistance alone.

  • Record VRWM, VC and IPP with their own basis.

  • Separate single-event ratings from cumulative thermal stress in repetitive service.

  • Verification should cover the worst combination of temperature, load and run time.

Keep the calculation and the board temperature separate

A datasheet describes the device under stated conditions. A board temperature rise, a different pad layout or a nearby heat source changes the result. Store the calculation, the measured temperature point and the operating profile as separate records.

RecordRecommended entryWhy it stays necessary
CalculationBoundary, value, source and conditionAllows the margin to be recomputed
Board temperatureMeasurement point, layout and loadShows the real thermal condition
Operating profileDuty, repetition and run durationLinks the rating to the actual cycle

Board verification sequence

  1. List the highest continuous voltage, pulse condition, ambient and thermal path.

  2. Check VRWM, VC and IPP against their stated test conditions.

  3. Measure device temperature and key node waveforms at worst load.

  4. Record leakage, temperature and function over the full run period.

FAQ

Is derating always a fixed percentage?

No. Voltage, pulse energy and thermal margins are set separately, and the tightest boundary governs.

If the device has not failed, is the margin sufficient?

Not necessarily. Rising leakage, high temperature rise and clamp drift can appear before hard failure.

Sources

Source check date: 2026-10-19. Derating conclusions should be recomputed from the recorded boundaries, the measured temperature points and the actual operating profile on the target board.